Protec Equipment Resources
   Contact Us: 866.352.5550
    

Alleviate Expensive Downtime with the Eaton Cutler Hammer 140D481G03 Secondary Injection Test Set

Posted by Protec Tech Team on

Defective circuit breakers can allow extensive damage, personnel injury, or make an outage more widespread when a fault occurs. They can also trip when they shouldn’t causing expensive downtime.

There is no way to know if a circuit breaker will operate properly under fault or overload conditions unless it is tested.

Eaton Cutler Hammer 140D481G03 Secondary Injection Test Set The Eaton Cutler Hammer 140D481G03 Secondary Injection Test Set is used to test and verify the pickup levels and time delay settings of a breaker’s trip unit. The Eaton Cutler Hammer 140D481G03 Secondary Injection Test Set is also used to test Amptector, Digitrip, RMS or Optim trip units. 

The Eaton Cutler Hammer 140D481G03 Secondary Injection Test Set passes enough current to check any desired calibration point, allowing the solid-state trip unit operation to be checked without using primary current. The breaker must be de-energized before checking the operation of the solid-state trip units. If the Eaton Cutler Hammer 140D481G03 Secondary Injection Test Set shows that the solid-state trip unit is not functioning properly, the trip unit should be replaced.

Each Protec office stocks a full complement of electrical test and measurement equipment.  Offering equipment from all of the premiere manufacturers for rent, lease or purchase, Protec has the electrical testing equipment you need to get the job done.

Topics: Rent Electrical Test Equipment, Secondary Injection Test

Recent Entries

Bolt-Rule-b.jpg

Protec Equipment Resources Inc.
National Headquarters
1517 West Carrier Pkwy
Suite 116
Grand Prairie, Texas 75050

Phone: 972.352.5550
Fax: 972.352.5553

Become a Protec Insider